Construction On 3rd Avenue Bridge To Begin On July 8

Speed Limit Change at 3rd Avenue Bridge

Construction on the NE 3rd Avenue Bridge over the Washougal River will begin July 8, 2021 and continue until December 2021.

Vehicular traffic will be temporarily reduced to a single lane in each direction throughout the duration of the project. The speed limit near the bridge will also temporarily be reduced to 25 mph.